Price incl. VAT, digital product without shipping costs (download after payment).
- Minimum details according to aBG section 3.7
- Project, company, hold-open system, location, period, number of the approval
- To be issued for each building project and handed to the client
Note: The general building approval (aBG) and the manufacturer's documents for the system take precedence. The template does not replace a professional inspection.